SAN DIEGO UNIFIED SCHOOL DISTRICT

Client

Price Philanthropies

San Diego Unified School District        

Project Lead

Mary Ann McBee, Playground Specialist 

Project Overview

This project involves the removal of existing Poured-In-Place rubber and install 3″ of Poured-In-Place Rubber 

Scope of Work

Removal of Poured-In-Place (PIP) Rubber

  • Remove existing PIP
  • Remove roots under PIP
  • Recompact existing base and add additional if needed

Poured-in-Place (PIP) Rubber Surfacing

  • Area: Approximately 500 square feet of 3″ PIP installed
  • Colors ad Designs:
    •  

The PIP surfacing will be installed as per plans, incorporating the specified colors and designs for aesthetic appeal and safety.

AFTER