MACKENZIE CREEK PARK
Client
City of Chula Vista
Project Lead
Mary Ann McBee, Playground Specialist
Project Overview
This project involves the professional installation of poured-in-place (PIP) surfacing.
Scope of Work
Poured-in-Place (PIP) Rubber Surfacing
The PIP surfacing will be installed as per plans, incorporating the specified colors and designs for aesthetic appeal and safety.
- Area: 951 square feet of 1 1/2″ PIP rubber surfacing installed
- Remove 12″ on concrete walkway side and install new buffings and top wear layer to be flush with sidewalk
- Blow off pad and re-seal with Aliphatic Binder
- Repair several holes in pad 2 x 2
- Colors:
- Color #1: 50% Black and 50% Earth Yellow