Pro Services General Contractors

MACKENZIE CREEK PARK

Client

City of Chula Vista 

Project Lead

Mary Ann McBee, Playground Specialist 

Project Overview

This project involves the professional installation of poured-in-place (PIP) surfacing.

Scope of Work

Poured-in-Place (PIP) Rubber Surfacing

The PIP surfacing will be installed as per plans, incorporating the specified colors and designs for aesthetic appeal and safety.

  • Area: 951 square feet of 1 1/2″ PIP rubber surfacing installed
  • Remove 12″ on concrete walkway side and install new buffings and top wear layer to be flush with sidewalk
  • Blow off pad and re-seal with Aliphatic Binder
  • Repair several holes in pad 2 x 2 
  • Colors:
    • Color #1: 50% Black and 50% Earth Yellow