Skip to main content

Pro Services General Contractors

MACKENZIE CREEK PARK

Client

City of Chula Vista 

Project Lead

Mary Ann McBee, Playground Specialist 

Project Overview

This project involves the professional installation of poured-in-place (PIP) surfacing.

Scope of Work

Poured-in-Place (PIP) Rubber Surfacing

The PIP surfacing will be installed as per plans, incorporating the specified colors and designs for aesthetic appeal and safety.

  • Area: 951 square feet of 1 1/2″ PIP rubber surfacing installed
  • Remove 12″ on concrete walkway side and install new buffings and top wear layer to be flush with sidewalk
  • Blow off pad and re-seal with Aliphatic Binder
  • Repair several holes in pad 2 x 2 
  • Colors:
    • Color #1: 50% Black and 50% Earth Yellow